Middle Susquehanna Riverkeeper
  • Home
    • About Us
  • Donate
    • Membership
    • Partners
  • Blog
  • Educational Programs
    • HERYN >
      • Blue HERYN
    • Vernal School
    • Floating Classroom
    • EELS Program
    • Riverwalks
    • Nature Book Club
    • Kayaking/Fishing Resources
    • Video Lessons
  • Podcasts
  • Report a concern
  • Songs 2026
  • Roundtables
  • Special Projects
    • West Branch Adventure
    • Hellbenders >
      • Hellbender Songs
    • BirdNET
    • Encina
    • Montour Surface Sampling
    • Vernal Pools
  • Gift Shop
  • Get Involved
    • Watershed Opportunities
    • Survey
    • Sentinels
  • Archive
    • Songs
    • Photos 2020
    • Songs 2021
    • Songs 2022
    • Songs 2023
    • Songs 2024
    • Songs 2025
    • 2018 PA River of the Year
    • 10 Fun Facts
    • For Children
    • Class ideas
  • Contact Us
  • Microplastics
  • 10 Years
  • Montour
  • Data centers

Riverkeeper reflections

Talen Energy shares details on Spillway Upgrade Project, efforts to prioritize safety, reduce impacts

4/20/2026

3 Comments

 
Picture
In this photo by Middle Susquehanna Riverkeeper Association Board President Michael Kinney, the Lake Chillisquaque spillway is shown to the left of the dam. The update project will close the section of Chilisuagi Trail (and the Planet Walk) between the dam and the boat launch parking lot for most of the duration of the project, which is expected to last approximately 12-18 months.
In an effort to prioritize safety and minimize impacts to visitors to the Montour Preserve, neighbors and local communities and the wildlife that calls the region home, Talen Energy has been carefully planning and making modifications to its impending Spillway Upgrade Project near Lake Chillisquaque’s manmade dam, according to Talen Energy Director of Corporate Communications Taryne Williams.

This includes lowering the lake’s water level, using controlled, low-leveled blasts to loosen and remove rock (in place of more intensive blasting) and timing excavation and construction phases to avoid peak migration and nesting timelines, she said.

“In addition to protecting the safety of visitors to the Montour Preserve and neighbors in the community, the project contractors will focus on minimizing impacts on wildlife and their habitats,” she said of the project, which will begin excavation in May. “This includes the eagles that nest at the Montour Preserve and the birds that are there during their migratory journey.”
A necessary upgrade
A high-rainfall event in 2018, where 4-6 inches of precipitation fell within 24 hours, led to erosion of the spillway for Lake Chillisquaque at the Montour Preserve.

Immediate repairs and improvements were made, but it was apparent the structure needed a long-term upgrade, and the event triggered an effort with the PA Department of Environmental Protection and Army Corps of Engineers that has led to a new Spillway Update Project that is preliminarily kicking off at the preserve and expected to last upwards of 18 months.

“This project represents an opportunity to upgrade and modernize the spillway to improve its functionality and extend its longevity,” said Williams. “The project will expand the spillway and install a drop structure that will help slow the flow of water from the lake during significant rainfall events. After an extensive three-year permit review and approval process, we look forward to completing it.” 

A dam spillway is a safety structure that allows excess water to flow out of a reservoir in a controlled way, preventing the dam from overtopping and failing. It is, basically, an extra safety measure, for those living downstream, according to Bob Stoudt, director of the Montour Area Recreation Commission.

“The spillway is an engineered component of the dam — essentially a reinforced, man-made channel — which allows water to safely flow in a controlled manner around the dam into Chillisquaque Creek during times of extremely high flows,” he said during an interview with The Daily Item. “The structure protects the dam from damage, thereby protecting downstream homes and properties.”

That theme of safety will be a priority that permeates the project from start to finish, according to Williams. As a precautionary measure, lake levels will be lowered throughout the project to minimize the impact of any significant precipitation events.

“An emergency plan for the lake already exists, and that plan will be used in the event of an significant rainfall event,” she said. “Talen has met with the local EMAs regarding the project, and they are aligned. Additionally, a tabletop exercise that includes Talen and EMA partners is also scheduled.”

Impacts to wildlife have also been scrutinized beforehand, according to Williams, who said that a bald eagle study was done using the US Fish and Wildlife Service’s online mapping tool to determine that eagle nests are outside of the “defined mitigation area” and the excavation and construction phases of the project “will be completed before the migratory birds return to the Montour Preserve. No impacts to fish or other inhabitants of the lake are expected.”

Preliminary work has started
This early preparation for the project has already begun and will include laying stone for a construction entrance, staging equipment, erecting fencing, installing silt socks and performing some minor excavation work.

Excavation phase
According to Williams, during the excavation phase, the existing spillway channel will be expanded to accommodate a roller compacted concrete (RCC) drop structure and stilling basin. This phase is expected to start next month and last through late summer. 

“While the majority of the excavation will be done using heavy equipment, it will be necessary to use controlled, low-level blasts to loosen and remove select sections of rock below the surface of the existing spillway channel,” said Williams. “In order to keep the lake, preserve and its visitors and inhabitants safe, the blasting will consist of small, controlled blasts that engineers characterize as being of a magnitude similar to a tractor trailer driving by on a 2-lane road.”

Williams added that it is estimated that this will occur approximately once a week for a handful of weeks, last for only a few minutes each, and be limited to daytime hours.

“The project specifications require that the contractor adhere to rigorous standards regarding the blasting operations. Each event must be approved by PADEP and notifications will be made to neighbors well in advance. Updates also will be posted on the project website,” she said. “Access to nearby areas at the Preserve will be limited and traffic controlled immediately before and during these short blasts.”

According to Willliams, excavated material will be hauled to a disposal area on the Montour plant property. 
“Increased truck traffic is expected during business hours on weekdays in summer and early fall,” she said. “The project team will coordinate with the applicable agencies on necessary permitting and work to minimize disruption.”   

Construction and restoration
Following excavation, the roller-compacted concrete (RCC) drop structure and stilling basin will be constructed on site and stalled within the existing auxiliary spillway channel “to safely convey spillway discharges to the valley floor,” according to Williams.

“This phase is expected to take place from late summer to late fall, with finish work potentially occurring in spring 2027 following the project’s winter pause,” she said.

Final grading will be completed during the restoration phase.

“Disturbed areas will be restored with grass, which is the preferred cover to support inspections and observe deficiencies,” Williams said. “Grass cover will support permanent stabilization of the site.”

For more info
Talen Energy plans to provide updates on the project via its own dedicated website – www.spillwayupgrade.com – where the public can sign up to receive updates directly and check out graphics, timelines and more. Updates can also be found via social media sites for the Montour Area Recreation Commission and Middle Susquehanna Riverkeeper Association.
3 Comments
안산출장마사지 link
4/30/2026 05:04:03 am

반복되는 피로에 효과적으로 대응할 수 있어 좋았습니다. 출장마사지 이용 후 전체적인 컨디션이 안정적으로 유지되었습니다.

Reply
abbotsford managed IT services link
5/5/2026 02:35:20 am

Professional IT support teams ensure smooth daily operations and fast fixes, abbotsford IT services increase reliability, strengthen systems, and support business success with consistent performance.

Reply
상품권신용카드 link
5/20/2026 12:34:51 am

다양한 디지털 결제 중 상품권소액결제는 직관적인 사용성과 빠른 처리 속도가 특징이며 처음 이용하는 사람도 쉽게 적응할 수 있어 만족도가 높습니다

Reply



Leave a Reply.

    Authors

    Riverkeeper John Zaktansky is an award-winning journalist and avid promoter of the outdoors who loves camping, kayaking, fishing and hunting with the family. 

    Regional Director Andrew Bechdel joined the team in early 2024 with a wide variety of natural experiences and a desire to educate.

    Archives

    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    October 2025
    September 2025
    August 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020

    Topics

    All

    RSS Feed

Your Pollution Hotline Number:
​570-768-6300

SUPPORT OUR WORK
Take our survey

BY BECOMING A SUSQUEHANNA NEIGHBOR TODAY.
​FROM CLEAN WATER FLOW THRIVING COMMUNITIES.

Picture

​Middle Susquehanna Riverkeeper is a member of Waterkeeper Alliance. Riverkeeper is a registered trademark and service mark of Riverkeeper, Inc. and is licensed for use herein. Waterkeeper is a registered trademark and service mark of Waterkeeper Alliance, Inc. and is licensed for use herein.

  • Home
    • About Us
  • Donate
    • Membership
    • Partners
  • Blog
  • Educational Programs
    • HERYN >
      • Blue HERYN
    • Vernal School
    • Floating Classroom
    • EELS Program
    • Riverwalks
    • Nature Book Club
    • Kayaking/Fishing Resources
    • Video Lessons
  • Podcasts
  • Report a concern
  • Songs 2026
  • Roundtables
  • Special Projects
    • West Branch Adventure
    • Hellbenders >
      • Hellbender Songs
    • BirdNET
    • Encina
    • Montour Surface Sampling
    • Vernal Pools
  • Gift Shop
  • Get Involved
    • Watershed Opportunities
    • Survey
    • Sentinels
  • Archive
    • Songs
    • Photos 2020
    • Songs 2021
    • Songs 2022
    • Songs 2023
    • Songs 2024
    • Songs 2025
    • 2018 PA River of the Year
    • 10 Fun Facts
    • For Children
    • Class ideas
  • Contact Us
  • Microplastics
  • 10 Years
  • Montour
  • Data centers